Raymond Sport
Raymond Sport

Since 1987 · UAE Sports Construction

Padel Court Construction in the UAE

Raymond Sport designs, supplies and installs padel courts across Dubai, Abu Dhabi and the wider UAE — built to International Padel Federation (FIP) dimensions, engineered for 45°C summers, and delivered as a single turnkey package by a team that has been building sports facilities in the Emirates for 38 years.

38+Years building UAE sports facilities
FIPStandard court dimensions
TurnkeyDesign, civils, supply, install
GCCUAE, KSA, Qatar, Oman, Bahrain
Padel court construction by Raymond Sport at a sports facility in Dubai, UAE

Turnkey Padel Court Construction, Start to Finish

We handle the whole build, not just the kit. That matters on padel more than most sports, because the majority of court failures in this region trace back to the slab and the drainage rather than the court system itself.

01

Site Survey & Feasibility

Levels, access, existing services, orientation and drainage assessed before anything is priced.

02

Structural & Civil Coordination

We work directly with your consultant and structural engineer on loadings, setting out and interfaces.

03

Sub-Base, Slab & Drainage

Compacted sub-base, reinforced concrete slab and drainage falls built to tolerance. The stage that decides court life.

04

Galvanised Steel Structure

Hot-dip galvanised frame specified for Gulf humidity and coastal exposure, set out and levelled on site.

05

Tempered Glass & Mesh

10mm or 12mm tempered safety glass panels with mesh fencing, installed to FIP enclosure heights.

06

Artificial Turf & Infill

UV-stabilised monofilament turf laid, seamed and line-marked, then infilled with silica sand and brushed to set the pile.

07

LED Floodlighting

Lighting designed to target lux and uniformity, supplied, installed, aimed and commissioned with on-site measurement.

08

Nets, Posts, Gates & Accessories

Competition-grade net systems, tensioning, access gates and court furniture supplied and fitted.

09

Handover & Warranty

Snag list closed, as-built documentation, maintenance schedule and full warranty pack issued at handover.

Single point of responsibility. One contract, one team, one company accountable for the finished court — from the ground up to the last light fitting.

Padel Court Dimensions and FIP Standards

A regulation padel court is 20 metres long by 10 metres wide, divided into two 10m × 10m halves by the net. The playing area is fully enclosed by a combination of tempered glass and mesh.

Padel court dimensions and specifications to International Padel Federation standards
Element Typical specification
Overall court size 20m × 10m playing area
Recommended total footprint Approximately 21m × 11m to allow for structure and safe access
Net height 88cm at the centre, 92cm at the posts
Back wall height 3m tempered glass, with mesh above to 4m
Side wall height 3m for the first 2m from each back wall, stepping down to 2m
Glass thickness 10mm or 12mm tempered safety glass
Structure Hot-dip galvanised steel, specified for Gulf humidity and coastal exposure
Service line 3m from the back wall
Minimum clear height (indoor) 6m recommended over the full court

Compliance note. Specifications should always be confirmed against the current International Padel Federation (FIP) rules and the requirements of the relevant national federation for your project. Raymond Sport prepares a full compliance schedule with every proposal, covering dimensions, materials, glass certification and lighting levels.

Types of Padel Court We Build

From standard club courts to full-glass panoramic installations and rooftop builds in Dubai — we specify and construct every padel court format used across the UAE.

Standard double padel court with tempered glass back walls built by Raymond Sport in the UAE Most Specified

Standard Double Court

The default configuration for clubs, communities and resorts. Glass back walls with mesh sides above the playing wall line. The most cost-effective format and the one most commonly specified across the UAE.

Panoramic padel court with full glass side walls installed by Raymond Sport in Dubai Premium

Panoramic Court

Full-glass side walls with no intermediate posts in the field of vision. Visually superior and better for spectators, broadcast and photography — the usual choice for premium hospitality and flagship club installations. Higher cost and a heavier structural requirement.

Single padel court for one-on-one play built at a private villa in the UAE Compact

Single (Individual) Court

A narrower court — typically 20m × 6m — for one-on-one play. Suitable for villas, compact rooftops and training facilities where a full double court will not fit.

Indoor covered padel court with LED floodlighting built by Raymond Sport in Dubai Year-Round Play

Indoor and Covered Courts

Increasingly the standard specification in the UAE. Covering a court extends usable hours across the summer months and protects turf and glass from UV degradation. Requires 6m+ clear height, with careful lighting and ventilation design to avoid glare and heat build-up.

Rooftop padel court installed on a residential development in Dubai by Raymond Sport Dubai Specialist

Rooftop Courts

Popular in Dubai on residential and mixed-use developments. These need structural load verification, wind loading assessment, acoustic isolation and specialist access planning. We coordinate directly with the project structural engineer from the first survey rather than discovering constraints late.

Our Padel Court Construction Process

Eight stages from first site visit to warranty handover. Every project follows the same sequence, with drawings, submittals and sign-off at each step.

  1. Site Assessment

    Levels, access, existing services, drainage and orientation. Court orientation matters — north–south alignment reduces low-sun glare and is worth planning for before anything is poured.

  2. Design and Specification

    Court type, glass thickness, turf selection, lighting layout and lux target, colour scheme. Issued to you as drawings and a written specification schedule — not a one-line quotation.

  3. Approvals Support

    We prepare material submittals, method statements and compliance documentation for consultant and authority review, and respond to comments until the package is approved.

  4. Critical Stage

    Groundworks

    Excavation, compacted sub-base and reinforced concrete slab. Slab flatness and falls are set to tolerance. This is the single most important stage of the build — most padel court failures in this region trace back to the slab, not the court system.

  5. Structure Erection

    Hot-dip galvanised frame set out and levelled, tempered glass panels installed, mesh fixed and tensioned to the specified enclosure heights.

  6. Turf Installation

    Rolled, seamed, line-marked and infilled with silica sand to the manufacturer's specified rate, then brushed to set the pile so the court plays correctly from day one.

  7. Lighting

    Pole or structure-mounted LED luminaires installed, aimed and commissioned. Lux and uniformity are measured on site and reported — not assumed from the catalogue.

  8. Handover

    Snag list closed, as-built documentation, maintenance schedule and full warranty pack issued. Your team is briefed on brushing, infill top-up and inspection intervals.

Padel Court Surfaces and Turf

The turf determines how the court plays and how long it lasts. In UAE conditions, UV stability is as important as playing characteristics.

Padel court artificial turf specification used by Raymond Sport in the UAE
Property What we specify
Yarn type Monofilament for better durability and ball response, or fibrillated where budget leads
Pile height Typically 12–15mm
Infill Rounded silica sand, applied at the manufacturer's specified rate
UV treatment UV-stabilised yarn — non-negotiable in the Gulf
Colours Blue, green, terracotta and custom club colours
Drainage Permeable backing with slab falls to perimeter drainage
Monofilament artificial turf being installed and infilled on a padel court in the UAE by Raymond Sport
Turf & Infill
Specifier's Warning

Under-specified turf is the most common false economy in padel. It looks identical on day one and visibly different after eighteen months of UAE sun — faded colour, flattened pile and a ball that no longer behaves the way players expect. Specifying correctly at the outset costs a fraction of relaying a court early.

Padel Court Lighting

Poor lighting ruins a good court. Padel is played close to glass, which makes glare control and uniformity more critical than raw output.

Typical illuminance targets for padel courts by level of play
Level of play Illuminance target Typical application
Recreational / community 200–300 lux Residential compounds, community parks, villa and rooftop courts
Club and general competition 300–500 lux Commercial padel clubs, hotels and resorts, school and university facilities
Official competition 500 lux and above Sanctioned tournament venues and federation-affiliated clubs
Broadcast Per event requirement Televised events, with flicker and colour rendering specified by the broadcaster

Glare Control

Aimed, not flooded

Luminaires positioned and aimed to keep glare out of the players' sightline through the glass.

Uniformity

Measured on site

Even light across the full playing area, verified at commissioning rather than assumed from the datasheet.

Efficiency

LED throughout

Lower running cost and longer service life than metal halide, with instant strike for hourly court bookings.

How we design it. We work to EN 12193 lighting classes, model the layout before installation, and measure lux and uniformity at commissioning. Confirm the exact requirement with the relevant federation for any court intended to host sanctioned competition — targets vary by governing body and event category.

Padel Court Maintenance

A well-built court needs little, but it does need something. This is the schedule we hand over with every padel court we build in the UAE — follow it and the court reaches the top of its service life.

Weekly

  • Brush the turf to redistribute infill and keep the pile upright
  • Clear leaves, sand and debris from the playing surface

Monthly

  • Check infill depth and top up where displaced, especially at the service boxes
  • Clean the glass panels inside and out

Quarterly

  • Inspect net tension, fixings and gate hinges
  • Check lighting output and replace any failed luminaires

Annually

  • Deep-clean the turf and decompact the infill
  • Full structural, glass and fixing inspection
5–8 yrs Typical turf life
UAE outdoor conditions

Expected turf life depends on usage intensity, infill maintenance and whether the court is covered. A well-brushed, correctly infilled court under a canopy will reach the upper end of that range; a neglected outdoor court in full sun will not. Covered courts consistently outlast open ones in this climate.

Why Build Your Padel Court With Raymond Sport

Padel is new to the region. We are not. Five reasons developers, clubs and government entities across the UAE appoint us to build their courts.

38

Years in UAE
sports construction

Trading since 1987 — longer than the sport of padel has existed in this region. We were building courts, tracks and sports surfaces in the Emirates decades before the first padel club opened here.

Turnkey Delivery

Design, civils, structure, surface and lighting under one contract — no gaps between trades, no finger-pointing.

Specification-Led

FIP dimensions, EN-referenced lighting and documented material submittals. You get drawings, not promises.

Built for This Climate

UV-stabilised materials and drainage detailing designed for Gulf conditions — not imported unchanged from Europe.

Dubai & Abu Dhabi Offices

Local teams, local supply chain, local aftercare. When a panel needs replacing, we are in the same city.

Trusted by leading UAE developers, government entities and hospitality groups

Emaar — Raymond Sport client Nakheel — Raymond Sport client DAMAC — Raymond Sport client Abu Dhabi Municipality — Raymond Sport client Dubai Police — Raymond Sport client Atlantis The Palm — Raymond Sport client

Padel Court Construction: Frequently Asked Questions

The questions clients ask us most often before commissioning a padel court in the UAE.

How long does it take to build a padel court in the UAE?

A standard outdoor double court typically takes 4–6 weeks on site once approvals and materials are in place, assuming no major groundworks. Indoor and panoramic courts take longer. Lead times on glass and structure should be confirmed at order.

What size plot do I need for a padel court?

The playing area is 20m × 10m. Allow approximately 21m × 11m to accommodate the structure, plus safe access around at least one side.

Do I need approval from Dubai Municipality to build a padel court?

Requirements depend on the location, whether the court is covered, and whether it sits within a master development. Raymond Sport prepares the technical submittals and coordinates with your consultant, but formal approval is obtained through the relevant authority for your plot.

Should a padel court in the UAE be indoor or outdoor?

Outdoor courts are less expensive and perfectly viable for eight to nine months of the year. If you need year-round revenue from the court, cover it. Most commercial operators in the UAE now specify covered or indoor courts for that reason.

What is the difference between a panoramic and a standard padel court?

A panoramic court uses full-height glass on the side walls with no intermediate vertical posts in the player's field of view. It plays the same but looks considerably better and photographs better. It costs more and requires a heavier supporting structure.

How long does padel turf last?

Typically 5–8 years in UAE outdoor conditions, depending on hours of play, infill maintenance and UV exposure. Covered courts last longer.

Can you build a padel court on a rooftop?

Yes, and we have. It requires structural load verification by the building's engineer, wind loading assessment, and an access plan for materials. We coordinate that process from the start rather than discovering it late.

Do you build padel courts outside the UAE?

Yes. We deliver across the GCC, including Saudi Arabia, Qatar, Oman, Bahrain and Kuwait.

Still have a question about your project? Send us your site details and our padel team will come back with a specification and a programme.

Cart (0 items)